当前位置: 初中英语 /
  • 1. (2022·泰安) 阅读理解

    The new railway line linking China and Laos (老挝) opened to traffic on December 3, 2021. All the passengers on the train were very excited.

    The line is 1,035 kilometers long and it runs between Kunming, the capital of Yunnan Province, and Vientiane (万象), the capital of Laos. It takes about 10 hours to get to Vientiane from Kunming. This line, with a top speed of 200 kilometers per hour, has 50 stations.

    Engineer (Ouyang Qiang took part in construction (建设) of the new line. "Each station along the line has a special and beautiful view." he said, adding that Yunnan has pleasant weather in all seasons and the views are fantastic all year round.

    Hang Dianhua. 76, was on the first train on Friday from Kunming to Xishuangbanna. "One of my students took part in this project. It's a proud event for China. I hope to take the train with my daughter and two granddaughters who live in Beijing in the future." Hang said.

    Jaruwan comes from Thatiland. Now she works in Yunnan. She was also a passenger on the train. She believes fruit from Thailand can be sent faster and cheaper to China. And at the same time, the new tourism routes (路线) might be developed thanks to the line. More Chinese people will take the railway to Laos, and then visit Thailand.

    The China-Laos Railway is part of a bigger plan to connect Kunming all the way with Singapore.

    1. (1) The new railway line runs between ________and________ now.
      A . Beijing; Xishuangbanna B . China; Singapore C . Kunming; Vientiane D . China; Thailand
    2. (2) Who took part in construction of the China-Laos Railway line?
      A . Hang Dianhua. B . Ouyang Qiang. C . Jaruwan. D . Hang Dianhua's daughter.
    3. (3) Which of the following statements about Hang Dianhua is NOT true?
      A . One of his students took part in the China-Laos railway project. B . He went to Xishuangbanna on the first train. C . He took the train together with his daughter and two granddaughters. D . He thought the opening of the new line was a proud event for China.
    4. (4) What can we know from the passage?
      A . The China-Laos railway line is 1. 035 kilometers long and has 200 stations. B . Ouyang Qiang was an engineer and he was Hang Dianhua's student. C . The fruit trade between China and Thailand can be more convenient. D . The Chinese tourists can take the railway to Singapore from Kunming now.

微信扫码预览、分享更方便