当前位置: 初中英语 /
  • 1. (2023八上·贵阳期中)  阅读理解

    The construction (建设)of high-speed railways in China began with the building of the Qinhuangdao-Shenyang High-Speed Railway (HSR) in 1999. Now the high-speed rail network in China is the largest in the world. So far, there have been about 1,700 kilometers of HSR in service, along with trains of an average (平均)speed of 220 km/h. 

    Now Chinese government plans to spend $300 million building the largest and fastest HSR system in the world by 2022. It's said that the trains can run 400 km/h and create new business for China and other countries through the Belt and Road.

    It's predicted that the HSR network in China will reach 30,000 kilometers and it will be like a grid, which is mainly made up of 8 long-distance high-speed rail lines: four north-south HSR lines and four east-west HSR lines. Except (除了) for the Qingdao-Taiyuan HSR, all HSR lines of the rail grid are longer than 1,000 kilometers.

    Feng Hao, an expert, says "Many markets along the Belt and Road, especially in Central Asia, Southeast Asia, the Middle East and Eastern European countries, are planning to build HSR lines."

    1. (1) China is going to build the largest and fastest HSR system in the world by ____. 
      A . 2020 B . 2021 C . 2022
    2. (2) Which picture can best describe the underlined word "grid"?
      A . B . C .
    3. (3) is shorter than 1,000 kilometers. 
      A . The Qingdao-Taiyuan HSR B . The Beijing-Shanghai HSR C . The Qinhuangdao-Shenyang HSR
    4. (4) Where can we most probably read the passage? 
      A . In a newspaper. B . In a storybook. C . In a picture book.

微信扫码预览、分享更方便